As of 9:00 AM this morning, there is still no construction activity/pumping at lagoon #150
Lagoon #164 Update:
I also checked the rip-rap overflow at lagoon #164 this AM and it looks like the contractor has improved the backside of the overflow by extending the rocks to the bottom of the embankment, thereby also increasing the slope a little bit. I don't know if the backside slope is good enough yet to prevent erosion.
Friday, May 29, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment