A meeting was held yesterday between Pulte (Project Managers Todd Dupuona and Allison Tucker), Thomas & Hutton Engineering, members of the Phase 5 Lagoon Committee, and several residents that reside around the perimeter of lagoon #150. The Neighborhood Representative from Murray Hill (or any assigned delegate) was noticeably absent from the meeting. Several issues were brought up by the residents that got the meeting off to a contentious start. However, in the end, things got worked out. The meeting would have been more productive, and less contentious, if the Neighborhood Representative had been keeping residents better informed and/or had been "working" issues deemed important to the residents. I believe the residents need to "light a fire" under their current representative to do the job he was elected to do, i.e.; represent them on all issues.
Note- The Phase 5 lagoon Committe has made a concerted effort to keep all Neighborhood Representatives updated on the lagoon reconstruction process, as well as any other relevant lagoon issues. We made if clear from day one that the Neighborhood Representatives and/or their delegate(s) were expected to be a key part of the process, and to keep residents well-informed.
Here is the list of the action items agreed to for Pulte to complete work on Lagoon 150:
1. The water level will be raised 0.4 feet and vegetation installed and/or stabilized to just below the water's edge.
2. Pond depth issue -- Convene a meeting to review the survey data involving the Phase 5 Lagoon Committee and lagoon resident Bob Hermann. The intent is to resolve the residents' concerns that the pond depth may not meet the 5 foot average. Residents indicated that they saw elevation readings being taken by forcing the survey rod down through silt until it reached a solid bottom of the pond.
3. It was also agreed that the issue of ongoing maintenance of the lagoon needs the attention of CAM. Todd Doupona will send an email to CAM requesting that CAM provide thorough maintenance on a regular, consistent and continuing basis. The same request will be made via email from the neighborhood rep for Murray Hill, Don Olexa (the email was sent today, Thursday, August 6th).
4. Replace any "dead" sod around the lagoon perimeter.
Since CAM, specifically Damon Williams and Keith Willis, and not Pulte is responsible for controlling the unwanted vegetation around lagoons, the residents were encouraged to contact Damon and/or Keith regarding this issue.
Showing posts with label Lagoon 150. Show all posts
Showing posts with label Lagoon 150. Show all posts
Thursday, August 6, 2009
Monday, July 27, 2009
Lagoon #150 Update
8:40AM- Although work on this lagoon appears to be completed, I don't know if the work to raise the control structure to elevation 12.2 ft was completed. In fact, I don't see any control structure in this lagoon. It must be pretty well hidden (either that or I'm going blind).
Friday, July 24, 2009
Lagoon #150 Update
9:00AM- The work on this lagoon appears to be completed. The opening in the shrubbery along the Bishop St side has been replanted, the new sod is down, and the new sprinkler system is working and seems to have good coverage of the sod in the common areas. Once the lagoon has filled with water, it should look very nice.
Thursday, July 23, 2009
Lagoon #150 Update
11:00AM- it looks like most, if not all, of the resodding has been completed. The focus of the work crew at this time appeared to be on replanting the shrubs that had been removed to enable the heavy equipment access to the lagoon.
Wednesday, July 22, 2009
Lagoon #150 Update
8:50AM- There were 16 workers resodding the north side of the embankment. They were working at a good "clip". I did notice that the "boss man" was also there.
They also had completed the resodding between #5 & #7 French Garden Ln and also the west embankment.
They also had completed the resodding between #5 & #7 French Garden Ln and also the west embankment.
Tuesday, July 21, 2009
Lagoon #150 Update
8:45AM- Twelve laborers supposedly doing some final grading of the embankment. Whatever they are being paid they are not worth it (after many observations of their productivity)!
They had also removed the soil near the culvert pipe in front of the Moore's home (as previously requested by the Moore's and approved by Pulte).
11:00 AM- New sod had been delivered and they were just beginning to put the new sod down on the west embankment.
Monday, July 20, 2009
Lagoon #150
Saturday, July 18, 2009
lagoon#150 Update
10:45AM- No sign of any acyivity at this time. It looks like they may have done a little more grading work with the backhoe late yesterday.
Friday, July 17, 2009
Lagoon #150 Update
8:50AM- No activity so far today. It looks like the backhoe had done some small amount of leveling of the embankment soil since my last visit yesterday.
Thursday, July 16, 2009
Lagoon #150 Update
10:35AM- No activity. No obvious change since yesterday.
4:10PM - Excavator has been removed. It had been used to replace and/or extend the inlet pipe at the northeast corner of the lagoon. No activity at this time.
4:10PM - Excavator has been removed. It had been used to replace and/or extend the inlet pipe at the northeast corner of the lagoon. No activity at this time.
Wednesday, July 15, 2009
Lagoon #150 Update
9:00AM- They now have an excavator and the small backhoe at the site. While I was there they dropped a load of gravel on the north side of the embankment (Bishop Street side) and left. I wonder what the gravel is for? No other activity at this time.
4:35PM -No sign of any activity. Large excavator and small backhoe are still on site.
Tuesday, July 14, 2009
Lagoon #150 Update
10:25AM- There were 8 landscapers manually finish-grading the embankment. I learned that they had attempted to use 2 Bobcats for this last week but that the Bobcats got stuck in the soil. The Bobcats had to be towed out. They apparently decided to use manual labor to do the work.
2:45PM - A small backhoe has been dropped off at the site. No other activity at this time.
Monday, July 13, 2009
Friday, July 10, 2009
Lagoon #150 Update
8:45AM- No activity at this time.
4:05PM- No activity at this time. No evidence of any work done on this lagoon today.
Note- French Garden Lane and Botanica Court have not had a Street Representative for a while now, so Donna Williams has volunteered to be the Acting Street Representative until a resident from one of those streets "steps up" to fill the vacancy. If interested in volunteering to help keep your neighbors informed, please contact Don Alexa, the Murray Hill representative on the NRC (Neighborhood Representative Council).
4:05PM- No activity at this time. No evidence of any work done on this lagoon today.
Note- French Garden Lane and Botanica Court have not had a Street Representative for a while now, so Donna Williams has volunteered to be the Acting Street Representative until a resident from one of those streets "steps up" to fill the vacancy. If interested in volunteering to help keep your neighbors informed, please contact Don Alexa, the Murray Hill representative on the NRC (Neighborhood Representative Council).
Thursday, July 9, 2009
Lagoon #150 Update
10:45AM - No activity at this time. It looks like they've completed preparing the soil between #5 & #7 French garden Lane in preparation for re-sodding.
Tuesday, July 7, 2009
Lagoon #150 Update
8:40 AM - There were 10 workers removing the sod between #5 & #7 French Garden Lane that was damaged by construction vehicles, and preparing the soil in preparation for re-sodding.
Wednesday, July 1, 2009
Lagoon #150 Update
at 8:40AM All equipment has been removed from this site. The last excavator was on the truck.
Tuesday, June 30, 2009
Lagoon #150 Update
8:45 AM The PG150M pump has been removed and is now being installed at lagoon #157. There are still 2 excavators at the site. One worker is on site smoothing out the mud ruts made when they removed the pump. No other activity.
Monday, June 29, 2009
Lagoon #150 Update
8:30AM the 3 excavators and pump were still on site, but not in operation. The rough grading of the banks seems to be completed. A 2 person surveying team from Thomas & Hutton were on site and beginning to survey the lagoon. No other activity at this time.
Friday, June 26, 2009
Lagoon #150 Update
At 8:30 AM there was no activity. The pump is "off" and the 3 excavators are still on site.