2:30PM- Rebuilding of the embankment has begun. PBG is currently working on the far side (NE corner). A 2nd PBG worker was removing the Bobcat away from the site. A T&H engineer was also on site. He briefly explained the compaction process to me and TJD. The pump was "on" but about 50% of the water being pumped was going back into the lagoon. However, the lagoon is pretty well drained-down at this time. The attached photo was taken at about 2:30 PM today