8:55AM - The excavator operator was "fired-up" and the operator was waiting for a load of soil to be delivered (it was late). With luck, he'll complete the soil distribution and rough grading today. There's still a lot of water in the lagoon from the recent rain. Both pumps were "off"
11:30 AM - It was reported that the excavator is at work, soil is being delivered, and T&H engineers are currently at the site.
Wednesday, July 29, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment