8:45AM- The lagoon is pretty well pumped-down again and ready for the additional dredging. It shouldn't take too long to excavate the small amount of material required to get the bottom depth to where it needs to be.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment