Monday, June 1, 2009

Lagoon# 150

Pulte's contractor started pumping out lagoon #150 early this morning. They have a large pump with a 4" hose, so it shouldn't take too long to pump the lagoon down. The contractor had previously said they were planning to pump directly from L-150 into L-164, but because L-164 is full they are discharging the water from L-150 into the nearest curb drain which apparently empties into a lagoon across the street (Bishop Street).

I have notified the Fishing Club team about the pumping, since they want to try to recover the larger fish that were apparently missed by Estate Management last week when EM seined L-150.

1 comment:

  1. I believe the water they are discharging into the storm drain feeds directly into Wetlands L which is west of French Garden and east of Biltmore. This wetlands has had standing water in it since Pulte built on French Garden and maybe before. Many trees are dead and many more dying.

    It is a crime.

    ReplyDelete