Tuesday, June 30, 2009

Lagoon #157 Update




8:35AM The PG150M pump is being installed by 4 workers.
10:45AM Pump has been installed but is not "on". Pulte expects pump to be turned "on" sometime today.
2:00PM Pump is "on" and outlet hose is fed into a sediment filter bag before discharge into the curb drain.
4:15PM Outlet hose is disconnected from the filter bag and unfiltered water is being pumped directly into the curb drain.