Wednesday, July 15, 2009

Lagoon #150 Update


9:00AM- They now have an excavator and the small backhoe at the site. While I was there they dropped a load of gravel on the north side of the embankment (Bishop Street side) and left. I wonder what the gravel is for? No other activity at this time.
4:35PM -No sign of any activity. Large excavator and small backhoe are still on site.