Friday, July 24, 2009

Lagoon #154 Update




9:05AM- Although a ladder is still at the site, repairing the control structure appears to be completed(?). However, the joint between the top of the old structure and the bottom of the addition to the structure appears to be leaking in a couple of places already. The dark areas just below the light colored cement in the top two photos show the leaking areas. Who knows how long it will be before these leaks become larger and "we're back to square one" with a lagoon that won't hold it's designed water level? This work either doesn't agree with the rework process that was explained to the Phase 5 Lagoon Committee and the Neighbor Representatives back in March/April or Pulte needs to find a better contractor. The grating also needs to be put back on top of the structure.