8:50AM-Both excavators continue to dredge the lagoon. Part of the embankment is higher than the rest of it. I assume they will "knock the high spot down" so it is level with the rest of the top of the embankment.
3:45PM Update - Apparently the contractor determined that there was too much gumbo to use on the embankment and decided to remove some of the material via dump trucks. One of the excavators is very close to the wetland and also very close to three large pine trees. Neighbors are concerned that the roots of the pine trees may be damaged. They are also upset that they weren't informed of the change in plans ahead of time.