9:ooAM - Workers had removed the plug from the curb drain and were letting water back into L-182 from L-172 (across the street). It looked like the excavator operator was getting ready to have the excavator removed from the site.


12:50PM Update - The landscaping crew was preparing the embankment for sod installation.


3:30PM Update - All but a small area of the embankment has been resodded. The landscaping crew was leaving for the day. The two photos above were taken at about 3:30 today