Pumping was in operation today at about 10:30 AM. The construction supervisor was the only one on site. The 4" flexible output hose remains kinked, so very little volume of water seems to be flowing. I believe the kink is prohibiting the flow volume. However, the supervisor seemed to think removing the kink by adding a 90 degree elbow between the pump output and the hose would make much difference!
BTW, the pump is quite a large unit.
Thursday, June 4, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment