No sign of any activity at 8:50AM today. The pump is "off". Water level is much lower than yesterday.
At 1:15PM today there were two excavators dredging this lagoon. A 3rd excavator was on site but not being used. The PG150M pump was "on".
At 1:15PM today there were two excavators dredging this lagoon. A 3rd excavator was on site but not being used. The PG150M pump was "on".
At 3:00PM a Thomas & Hutton worker (engineer?) was at the site. Pump was still ("on").
No comments:
Post a Comment