8:30 AM The excavator was back at the site. The pump was not "on". No workers at the site.
2:15PM the pump was back "on" and the water level was down considerably from this morning. no workers at site. Excavator is still there.
The purpose of this site is to provide current status of Pulte's work on the Phase 5 lagoons. It will also serve as a repository for a two-way exchange of relevant information from all interested parties regarding the work being done. Refer to the Post of May 26,2009 decsribing the Background, Goal, and Mission of this site.