Saturday, August 1, 2009

Lagoon #157 Update

3:30PM - No activity at this time. The pumps are gone. The excavator is still at the site. It looks like the rough grading of the embankment may be completed. They have also made the "cut" in the north bank for the rip-rap overflow. The lagoon has a lot of water in it. It will be interesting to see how they install the rip-rap materials without draining down the lagoon.