Wednesday, August 5, 2009

Lagoon #157 Update





9:45Am- Excavator, Bobcat, and Trench Digger, plus 6 workers were on site. The Bobcat operator was spreading soil along the top of the west embankment. Five other workers were spreading soil in the rip-rap overflow area. Since the water is very high in this lagoon, not much of the rip-rap overflow area is exposed.

As I was leaving, three dump trucks (2 PBG and 1 independent) arrived with a soil delivery.