Thursday, August 13, 2009

Lagoon#153 update




9:00Am - The pump is "on". I estimate 20% of the water is going back into the lagoon because of the way the outlet hose is attached to the weir grating (not a big deal but it is inefficient). Last night's heavy rain deposited a lot of water in the lagoon, such that the level is back up to where it was two days ago. The excavator is on site but nothing more has been done since the initial excavation of the embankment. I noticed that the pump was "smoking" and was not doing that yesterday. I am not sure if it is a problem or not, but have notified Pulte via email (just in case).

No comments:

Post a Comment