Thursday, September 3, 2009

Lagoon #153 Update


8:45AM - Mini-excavator, bobcat, ditch-witch and several wood pallets are still at the site. No workers on site. No change since yesterday. Water level is still "holding" at the top of the weir.
All equipment/materials need to be removed from the access area, the "distrubed" soil leveled and resodded.
11:00AM Update- There were four workers on site and it looked like they were preparing to remove the equipment from the site.
4:00PM Update- All equipment has been removed from the site and the access area graded and prepared for sod installation.