Tuesday, September 22, 2009

Lagoon #178 Update

8:50 AM- Lots of activity this AM. Continuing to remove excess soil from the dredging operation via dump truck. About 20 pallets of sod are on site and the landscaping crew (8 + supervisor) were preparing the soil.

4:00PM Update- At a meeting with Todd Doupona and Allison Tucker today, Todd explained the issue with the weir's grating cover. Apparently the problem was that the weir was not level,it may have shifted because of the large amount of excavation around it. The grating did fit the new riser opening. However, in order to have the grating level when installed, a decision was made to shim the grating using hydraulic cement. The solution was discussed with Neighborhood Representative, Rich Barton, who agreed with the solution as acceptable.