Lagoon #178




3:30 PM Friday (9/5)- This lagoon is almost completely "pumped down" in preparation for excavation. the water is being pumped into the overflow weir at the north end of the lagoon.
A large excavator, large pump and a gas tank are currently at the site.

Note- The pump was initially turned "on" at 3:00PM Thursday (9/3) and operated for about 30 minutes before being turned "off". The pump was restarted sometime Friday morning. We had no notification of any fish recovery activity by Pulte and/or Estate Management Services, so we don't know if any of the large fish in this lagoon have been recovered to one of the 5 lagoons designated by the SC Fishing Club.